Lydon Millwright projects

Current Projects:

Atlanta

Working in Terminal E of the Hartsfield Jackson International airport doing ROW (right of way) for the new Terminal F Expansion Project for Vanderlande Industries.

Chicago

Installation of a new ticket counter conveyor and make up unit to provide screening for the Delta-Northwest merger at O'Hare International Airport..

Cincinnati

Installation of a new baggage screening system under G&T.

Lake Road Generating Plant, Dayville, CT

Since beginning work in Jan. 2003, Lydon has been the millwright contractor of choice providing original installations, scheduled maintenance, emergency repairs, and outage services.

Orlando International Airport, Orlando, FL

Installation of inline baggage screening system for J.B. Webb, supporting 6 EDS machines and a claim unit.

Quincy Fore River

Gas turbine generator outage for Mitsubishi.

Wyman Gordon North Grafton, MA

Since beginning work in Nov. 2003, Lydon has been the millwright contractor of choice providing scheduled maintenance, emergency repairs, & outage services.


Completed Projects:

Bristol Municipal WWTF, Bristol, RI

Lydon Millwrights replaced two aging screw pumps in Mar. 2007.

Brockton Municipal WWTF, Brockton, MA

Installation of 6 clarifiers, 2 centrifuges with over 200' of sludge conveyor systems, as well as 2 Aqua Diamond filter systems.

Buffalo International Airport, Buffalo, NY

Installation of new baggage screening system including 6 new scanners as part of the airport's expansion program. On schedule for completion in Oct. 2008.

Cos Cob Peaking Station, Cos Cob, CT

Lydon Millwrights assisted in preparing the site pad before installing a new gas turbine and generator and erecting the structure housing the equipment.

CRRA Conveyor Refurbishment CV-126/226 for MDC in Hartford, CT

Refurbished straight belted conveyor to a troughed belted conveyor.

Houston International Airport, Houston, TX

Installation of new BHS to add an additional 8 scanners to the existing Continental Airlines system.

Fields Point Tunnel Pump Station Project, Providence, RI

Installation of crane bridge designed to remove screenings at the low end of CSO tunnel 300 feet below ground elevation.

Guam International Airport, Guam

As part of Guam International Airport's new International Transfer Facility, 30 new Siemens High Speed Diverters (HSD) were installed into the existing outbound baggage system.

Lowes Distribution Center, Plainfield, CT

Installation of package handling conveyor system for a 1.5 million s.f. distibution center. Begun late 2004 and completed on schedule in 2005.

O'Hare International Airport, Chicago, IL

From Feb. 2006 and continuing into the present, Lydon has completed numerous projects including maintenance, repairs and upgrades.

Pittsburgh International Airport, Pittsburgh, PA

Installation of inline baggage screening system supporting 4 EDS machines for G&T Conveyor.

Rochester International Airport, Rochester, NY

Inline baggage handling conveyor installations for G&T Conveyor of Florida.

 